Global leading provider of Quality Surveillance,
Concrete Test, Overall Design Engineering and
Document Control services for power plants

Quality Surveillance
Top 1 provider of quality surveillance of equipment and materials in all Korean nuclear power plants, and UAE Barakah NPPs
KOCEN operates the KEPIC(Korea Electric Power Industry Code) quality assurance system in the field of quality surveillance and assures publicness and independence as a national authorized inspection body according to ISO/IEC 17020 certified by KOLAS.
KOCEN successfully carries out quality surveillance projects for domestic newly built and operating NPPs, UAE Barakah NPPs, ARA research reactor as well as transport containers for used nuclear fuel and thermal power plants. KOCEN is the top 1 provider for this field in Korea.

KOCEN also has a strong reputation as an independent third-party inspection, expediting, and managing supply chain provider predominately not only for regulators but also for suppliers, vendors and operators in power plants and industrial plant sector.
  • Leading provider of quality surveillance of equipment and materials, survey, inspection, expediting and managing supply chain in newly built and operating power plants, and industrial plants.
  • KOCEN provides the best quality service with KEPIC QAP, ASME NQA-1, quality assurance system according to the license approval requirements and unique, well-organized quality surveillance system.
  • KOCEN assures reliability, publicness and independence as a National Authorized Inspection Body according to ISO / IEC 17020 certified by Korea Laboratory Accreditation Scheme.
  • KOCEN enhances the reliability of the equipment and aims to prevent schedule delay by taking proactive actions for nonconformance.

WORK SCOPE

  • Quality surveillance of equipment / materials and release shipment
  • Expediting, Process Control
  • Preparation of quality surveillance plans and procedures
  • Review and approval of supplier quality plans
  • Academy business for power plant component design fabrication training
  • Quality inspection of construction, installation and startup operation
  • Technical consulting and evaluation of quality systems
  • Preparation of itemized quality surveillance guidelines
  • Managing supply chain, supplier assessment
  • PED inspection and ASME accreditation
  • Development of Korea Electric Power Industry Code(KEPIC) for power plants

MAJOR CLIENTS

National Authorized Inspection
Body according to ISO / IEC 17020 certified
by KOLAS(Korea Laboratory Accreditation Scheme) for KOCEN Quality Surveillance

KOCEN quality surveillance department developed a quality surveillance system based on ISO / IEC 17020. KOLAS assessed the capability for quality surveillance of nuclear power generation facilities and certified KOCEN as a national authorized inspection body.

AWARDS

 Awarded a plaque of appreciation for excellent subcontractor of KHNP for Shin-Kori 1 project in 2009

 Awarded a plaque of appreciation of KEPCO for UAE Barakah NPP 1 project in 2016 & 2020

 Awarded a prize by Ministry of Trade Industry and Energy(MOTIE) for Shin-Hanul 1 project

EXPERIENCES

  • Quality inspection of equipment and materials
    / construction inspection of newly built NPP
    • Hanul 1·2·3·4·5·6
    • Wolsong 2·3·4
    • KEDO 1·2 in North Korea
    • Hanbit 3·4·5·6
    • Shin-Kori 1·2·3·4·5·6
    • Shin-Wolsong 1·2
    • Shin-Hanul 1·2
    • UAE Barakah 1·2·3·4
    • ITER
    • New export research reactor
    • ARA research reactor
  • Quality inspection of replacement construction
    of operating NPP
    • Hanul 1·2·3·4 replacement of steam generator
    • Hanbit 5·6 replacement of steam generator
    • Hanbit 5,6 / Hanul 3,4 replacement of reactor vessel
  • Quality inspection of equipment and materials
    of thermal and combined cycle power plant
    • Hadong 7·8
    • Dangjin 5·6·9·10
    • Yeongheung 1·2·3·4
    • 765kV transmission tower
    • Pyungtaek
    • Taean 9·10 & Taean IGCC
    • Donducheon
    • Shin-Boryeong 1·2
    • Seoul 1·2
    • Shin-Seocheon
    • Jeju LNG
    • Namjeju
    • Shin-Sejong
    • Eumseong
    • Gumi
  • Quality inspection of operating thermal power plant
    • KOEN Quality inspection of equipment and materials
    • KOSPO Quality inspection of plan preventive maintenance construction
    • KOMIPO Quality inspection of plan preventive maintenance construction
    • EWS Quality inspection of equipment and materials
  • Quality inspection of equipment and materials of combined heat & power plant(CHP) and district transmission pipe
    • Osan CHP
    • Hwasung-Dongtan 2 CHP
    • Kimpo CHP
    • KDHC Pre-insulated pipes
    • Daeho Lake Water Solar Construction
  • Quality inspection of overseas EPC project
    • KEPCO E&C, Ghana Takoradi T1 & T2 power plant EPC
    • SWCC, RIYADH new city feeders
    • GE Power, Combined cycle gas turbine, Sabiya power station
    • GE Power, Bhola II
    • LUKOIL, EPC for Dammam decentralized water injection water supply wells
    • CPECC, Bab integrated facilities
    • SKODA JS, Cask body
    • Hyundai Co., Dangote / BPCL
    • MAN India, HPCL / Haldia
    • Hyundai Steel, Anjung / Bokor
    • Petrofac, Fadhili / Salalah / GC-32 / BP Ghazeer